And well on our way. Here are a bunch of pictures from the last several weeks:
![Yay! First construction project using power tools, many many more to go.](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/IMG_2910-small.jpg)
Yay! First construction project using power tools, many many more to go.
![View from Mt. Walker](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/IMG_2889-small1.jpg)
View from Mt. Walker
Kelly’s first building project: a very sturdy picnic table.
![Robert, checking out the septic tanks.](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/IMG_2904-small.jpg)
Robert, checking out the septic tanks.
![The septic tanks are huge!](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/IMG_2903-small.jpg)
The septic tanks are huge!
![The site is excavated and the foundation is staked out.](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/DSCN0545-small1.jpg)
The site is excavated and the foundation is staked out.
![Excavation activity.](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/DSCN0535-small1.jpg)
Excavation activity.
![Septic tanks are in.](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/DSCN0538-small1.jpg)
Septic tanks are in.
![Excavation work.](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/DSCN0543-small1.jpg)
Excavation work.
![In goes the concrete.](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/DSCN0566-small.jpg)
In goes the concrete.
![Cement truck for the foundation.](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/DSCN0567-small.jpg)
Cement truck for the foundation.
![Crew working on the foundation.](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/DSCN0571-small.jpg)
Crew working on the foundation.
![Foundation is done!](https://cabin.gashalot.com/wp-content/uploads/sites/3/2013/07/DSCN0575-small.jpg)
Foundation is done!