Exterior colors

We have selected the exterior colors for the cabin. Our builders had an awesome idea for the exterior. We will have a light grey deck, dark gray accent on the walls with the primary exterior color as yellow. The roof will be blue!

20130729-102720.jpg

20130729-102728.jpg

20130729-102747.jpg 20130729-102740.jpg 20130729-102735.jpg

The Framing Has Begun!

Trees downed in the making of the drain field.  This one was a beauty, but it will also make beautiful fires.

Trees downed in the making of the drain field. This one was a beauty, but it will also make beautiful fires.

The drain field.

The drain field.

The drain field is ready for sand to be added.

The drain field is ready for sand to be added.

The drain field has been cleared.

The drain field has been cleared.

The retaining wall for the septic tanks.

The retaining wall for the septic tanks.

Picture of the cabin from the top of the driveway.

Picture of the cabin from the top of the driveway.

Yay, we have hammocks now.

Yay, we have hammocks now.

The "side yard" has been leveled--sort of.

The “side yard” has been leveled–sort of.

Looking from the south towards what will be large sliding glass doors.

Looking from the south towards what will be large sliding glass doors.

"Retaining wall" for the septic tanks.

“Retaining wall” for the septic tanks.

Septic tanks are buried.

Septic tanks are buried.

IMG_2912-small

We’re Permitted and Have a Foundation!

And well on our way.  Here are a bunch of pictures from the last several weeks:

Yay!  First construction project using power tools, many many more to go.

Yay! First construction project using power tools, many many more to go.

 

View from Mt. Walker

View from Mt. Walker

Kelly’s first building project: a very sturdy picnic table.
Robert, checking out the septic tanks.

Robert, checking out the septic tanks.

The septic tanks are huge!

The septic tanks are huge!

The site is excavated and the foundation is staked out.

The site is excavated and the foundation is staked out.

Excavation activity.

Excavation activity.

Septic tanks are in.

Septic tanks are in.

Excavation work.

Excavation work.

In goes the concrete.

In goes the concrete.

Cement truck for the foundation.

Cement truck for the foundation.

Crew working on the foundation.

Crew working on the foundation.

Foundation is done!

Foundation is done!