Such a productive weekend! We were able to cut and lay the countertops (reclaimed slate chalk boards from a local high school). The red stuff in the pictures is water proofing on the substrate and we will cover it with wood edging.
I also finished the shelving on the custom cabinet that we did. We used leftover flooring and it looks great.
Robert mounted all of the posts for the railings and we mounted the top rail. The materials for the rest of the railings aren’t here yet, so they will stay like this for a little while.